DOE

Materials Research Laboratory

About    Directory    Contact Us    For Visitors    Search MRL    Text Only

Central Facilities - Becoming a User

Becoming a User

The FS-MRL Central Facilities operate as user facilities, that is, the preferred mode of operation is self-use after completing the necessary training. In certain cases when advanced characterization is required or if the project is short-term, facility staff can perform the analysis/processing of samples for users. Researchers, who are not from the University of Illinois, are required to sign a facility use agreement for self-use and a technical testing agreement for sample analysis by staff. Everyone is required to submit a proposal.

Click to view the fee structure

3-Step Guide for University of Illinois Users (includes UIUC, UIS, & UIC)

Step 1

Complete the FSMRL Central Facilities Use Proposal Electronic Form by clicking on the link below, to generate a new proposal. We recommend that the student or post-doctoral researcher (principal user) fill out and submit the proposal.

The suggested process is that you use the FSMRL Central Facility Use Proposal Form (.pdf) to gather the needed information prior to attempting to fill out the electronic form. It is strongly recommended that students review the information with their advisor prior to submitting the electronic form. Submission of the electronic form is required. Paper copies will not be accepted.

Please do not use your browser's back button while filling out the electronic form, this may cause your submission to fail. Also, we suggest you use cut and paste from a local text editor to enter answers to questions in the proposal form. This will save you from re-typing the answers in the unlikely event of an error in your submission. Please, follow the instructions carefully and provide the information as requested.

** FSMRL Central Facility Use Proposal Electronic Form and Submission **

For additional information on the proposal process or status contact:

Ramona Simpson
Room 2015
Frederick Seitz Materials Research Laboratory, MC- 230
University of Illinois at Urbana-Champaign
104 S. Goodwin Avenue
Urbana, IL 61801-2985
Tel.: (217) 333-1370
Fax: (217) 244-2278
Email: simpson@mrl.uiuc.edu

Step 2

When received, the Proposal will be routed to the Director of Central Facilities for an initial review. If all of the information is complete, the Director will forward it to the Facility Advisory Committee. Upon approval of the Advisory Committee, the Proposal will be accepted. The researcher will then be notified, and the visit will be scheduled. Time required for the approval process varies and is usually 2-4 weeks; each proposal is unique and must be carefully evaluated.

Step 3

Users need to familiarize themselves with the University health and safety regulations prior to using the facility. All users will be required to complete University of Illinois general laboratory safety training. In addition during training, instrument specific safety instructions will be given.